AWG G3 PAD FOR PS3 Dokumentacja Strona 163

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 285
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 162
General Purpose Power Supply (GPDPS) 6 Device PowerSupply
System Reference, January 2001
163
Routing DPS Lines
Ensure that Power and Ground lines are laid out one
directly above the other.
Wire width = 3 A/mm
2
.
Sense lines must be positioned close together and parallel
to each other to avoid induction of interference. Further-
more, Sense/Force connections must be positioned as
close as possible to the DUT. Failure to observe this rule
will cause you to include the potential difference devel-
oped across the track between the DUT pin and the sense
point in your measurement.
Figure 75 DPS Connections
You can check the DPS connectivity with the DPS Connec-
tivity Test (refer to the Standard Test Function Refer-
ence, Part No. E7050-91012).
P (F+)
S
GS
G (F–)
+
DUT
Przeglądanie stron 162
1 2 ... 158 159 160 161 162 163 164 165 166 167 168 ... 284 285

Komentarze do niniejszej Instrukcji

Brak uwag